PARIC :: THE NEXT LEVEL STARTS HERE

HOME

HEADLINES:

Paric Completes MRI Project for St. Louis Children’s Hospital

Posted on August 3, 2009

The St. Louis-area-based Paric has completed a $1 million MRI construction project at St. Louis Children’s Hospital.The quick-turn 14-week, 1,750-square-foot project, led by Paric’s special projects group, included the addition of all new MRI equipment, a HVAC system, new electrical service with emergency back-up and the relocation of the existing image-reading room.

The architectural firm OWH and the engineering firm Biagi, Chance, Cummins, London, Titzer, Inc. joined Paric on the project.

BACK TO HEADLINES

DESIGN BUILD : CONSTRUCTION MANAGEMENT : GENERAL CONTRACTING
BEST VIEWED IN IE 7, FIREFOX 3, OR HIGHER.