CONFIDENTIAL CLIENT – DATA HALL HOT AISLE CONTAINMENT INSTALLATION

This project was completed in a live 50,000 sq. ft. data center. It consisted of the removal and replacement of the existing ceiling system with a Tate Duo structural ceiling, upgrading humidification in the data center, upgrading the fire alarm system, repairing the existing floating floor, new paint, and installing hot aisle containment throughout while maintaining a fully operational data center.
The PARIC team strategically phased this project with all trades to ensure the live data servers did not overheat when removing the existing ceiling which acted as the return air plenum. PARIC achieved zero shut down time of the data center across the life of the project.