Construction of a new two-tier precast parking deck is complete on the Corporate Hill campus office park. After demolition and a new drilled concrete pier foundation, 602 parking spots on three levels were added as well as an elevator and two stairwells. In addition to the parking structure, the storm sewer was relocated and Corporate Hill Drive was reconstructed.
Corporate Hill Parking Garage
Got a project in mind? Let's talk.
related projects
Salvation Army Veteran’s Housing
Commercial, Historic Renovation, Multi-Family, Public & Municipal
This $9 million, three-story, 48-unit apartment building serves as a bridge for men and women returning from combat as they reintegrate themselves into daily life. The building features, marble countertops, top of the line appliances and a computer lab for residents.
Consolidated Electric Cooperative
Commercial, Electric Cooperative
Consolidated Electric Cooperative hired Cooperative Building Solutions to provide a turn key solution to solve their facility need challenges.
Prairie Land Electric Cooperative
Commercial, Electric Cooperative
This 9,648 SF existing main level of the office for Prairie Land Electric Cooperative is a pre-engineered metal building structure with a standing seam metal roof. The exterior walls have a split face block veneer, insulated aluminum windows, and an EIFS soffit and fascia.
Cube Smart Self Storage
PARIC recently completed this new 93,000 sq. ft. climate controlled storage facility in St. Peter’s, Missouri.