Medina Electric Cooperative

Description

Medina Electric recently relocated their Rio Grande City office to a new 8-acre site in town. The new facility consists of a 9,500 sq. ft. office building, 6,000 sq. ft. warehouse, 6,000 sq. ft. vehicle storage building, and a 2,700 sq. ft. covered parking structure. The entire structure was designed as a pre-engineered metal building, including brick and metal panel façade. The facility utilizes LED lighting throughout, rainwater collection for irrigation, and other high-efficiency design concepts. A hardened space was constructed to protect sensitive IT servers and infrastructure. The new secure site is now surrounded by an 8 foot-tall concrete fence along with access control throughout the facility.

 

Markets
Location

Rio Grande, TX

Size

24,343 sq. ft

March 2018

February 2018

January 2018

December 2017

November 2017

October 2017

 

Electric Cooperative

Midwest Energy and Communications - PARIC recently completed construction on a new 129,000 sq. ft. headquarters facility. The project consists of a two-story tilt-up office building, a one-story warehouse, vehicle storage,…View Project

Electric Cooperative

Red River Valley REA - Red River Valley REA has decided to relocate their headquarters facility to a new location on 15 acres near their existing solar field in Marietta,…View Project

Electric Cooperative

Dixie Power Electric Cooperative - Dixie Power of St. George, Utah has decided to design and build two new facilities to meet their growing needs. A new 11,500 sq. ft.…View Project

Electric Cooperative

Central Texas Electric Cooperative – Fredericksburg - A new 48,000 sq. ft. operations facility was constructed adjacent to the existing headquarters in Fredericksburg.View Project

Electric Cooperative

Cimarron Electric Cooperative - This project for Cimarron consisted of a new 21,110 sq. ft. warehouse facility and a 15,750 sq. ft. renovation to their existing warehouse.  The new…View Project

Electric Cooperative

Central Texas Electric Cooperative – Mason - PARIC recently completed a new 17,500 sq. ft.  service center on a 9.5 acres facility for Central Texas Electric Cooperative in Mason.View Project

Electric Cooperative

Ninnescah Electric Cooperative - This completed facility includes 28,900 sq. ft.  of office, vehicle storage, and warehouse space on 10 acres.View Project

New Operations Facility

Mt. Wheeler Power - Mt. Wheeler Power is currently in the process of adding a new operations facility on their existing property.View Project